Lynbar Hall Batrhoom

Gutted this hall bathroom to the studs! Replaced the floor joists and sub-floor. Replaced the ceiling. Moved the electrical receptacle and installed new electrical switches with decorative plate. Installed a new Atrium 3000 Series Vinyl replacement window with opaque glass! Installed new Kohler acrylic deep alcove tub, Kohler tub fixture with hand-held shower head, and Kohler vanity faucet. Installed new American Standard toilet. Built new niches in the walls of the tub/shower area. Installed hand poured porcelain subway tile on the tub/shower walls and bathroom walls. Installed ceramic tile floor with dots. Installed furniture style vanity with granite counter-top. Installed new accessories, LED light/fan above the tub/shower. Installed new decorative mirror. Painted the walls, trim, and ceiling with Sherwin-Williams paint products.
Project Year: 2016
Project Cost: $10,001 - $25,000
Country: United States
Zip Code: 38117