Before and After Builders, Inc.
110 Reviews

Wynmont Master Bathroom

Remodeled this master bathroom! Increased the size of the shower, made the entry wider and installed frameless glass shower door and panel, installed a folding teak seat, grab bar, recess/niche, moved the location of the shower head, and added a hand-held shower head. Moved the orientation of the tub, and installed a pedestal tub with a shelf mounted into the wall for accessories. Install new 12x24 porcelain tile in the main bathroom floor and walls of the shower. We used the shower floor tile as a band in the shower. Removed and re-installed the cherry vanity cabinets and make-up desk. Installed marble countertops and backsplash, porcelan undermount sinks, and Delta fixtures. Installed new framed mirrors, accesories, and all new electrcial switches/receptacles and decorative plates. Removed the linen closet door and installed a new mirrored door. Installed new hardware and door knobs on all the doors. Installed a new chandelier over the tub, and a new LED light/fan in the shower. Installed new Kohler toilet. Painted ceilings, walls, and trim/doors with Sherwin-Williams paint products.
Project Year: 2016
Project Cost: $25,001 - $50,000
Country: United States
Zip Code: 38017