14” crease in finish
Q
Seam in finish at edge of fireplace surround
This is the exposed drywall edge and unfinished seam
Drywall finish around fireplace frame
Gap between fireplace face and wall (after 5th rebuild)
Here you can see where gaps are filling with bits of stone and dirt
Gap in flooring has fully separated
Gaps in flooring
flooring gaps
More flooring gaps
Flooring install
Exposed wire in Island; electrical inspection indicated over $3500 in electrical work required for us to pass code.
Wiring with no box...just hole in the wall.
Ceiling dry wall repair
Drywall issues in painted area
Hole for soap drilled on site
Door jam painted
Paint job on brand new trim
6 inch glass crack that was never fixed
After clean-up
Basement flood
Mold growing up drywall after renovation flood
Mold from basement flood from renovation
Unfinished deck edge
Bowed door (one of many); difficult to see but note how this bulges in the center up to 3/4 inch
Hard to get in a picture, but set drawers bow out >1/4 inch in centers and don't lay flush.
Paint finish on custom cabinets
Custom cabinet finish
Cabinet install
Finished tile job
Tile work
More tile install
14” crease in finish
Q