I was holding off on lighting up the internet with reviews, but their unwillingness to rectify, and their attorney’s use of threats and scare tactics, have left me no option.
I will stick to the facts in this review. The contract was for a deck job, partially enclosed, dated July, 2016 to be completed September, 2016. The project is still not done, with incomplete and poor quality. I wish I could provide pictures, but here are the facts:
Lateness: This job started out late and got worse. The only excuse ever provided was "the panels took much longer to mill". We went a full 2 weeks over the summer without anyone appearing for work and no contact or any other explanations were provided.
Contract issues: Things promised during contract discussion and signing, but now claiming “this is not part of the contract”. Numerous examples: 1) a half-hour shelf discussion of building a shelf, 2) an access door for below deck (so that you can get under it for maintenance), 3) stairs disconnected from existing walkway. I think there is a general belief among homeowners that your new project will not make the site look worse, or, if so, then the contractor should at least tell the homeowner, for example “just to let you know-your new stair location will land on mud and will be disconnected from your current existing walkway”. 4) screen portion of the below deck is not where it should be as depicted in the rendering provided per contract. The excuse is that “it cannot be at the designed location due to unforeseen rocks”, with reference to the contract. The problem with this argument is that the rocks are giant and above ground, and were seen and even photographed on the initial site visit. All of this is evidence of promises made during contract signing, with no intention of fulfilling.
Quality: Framing violation issues identified by our town inspector. Initially, this was promised to be taken care of by the contractor. Within the same day of his promise to the inspector, he reversed himself-opting instead to bundle this with other items on the “to do” list. Then, inexplicably, this framing issue is “dropped” from the list of items to be done.
Other quality issues: 1) gutter downspout empties onto the below deck screen. Anyone think that screen will last long? with water pounding on it? 2) light and missing paint 3) “butt joints” used in connecting pine trim boards, rather than the more professional “scarf overlap” joint, which provides a nice smooth or invisible joint. 4) nail holes not puttied/finished 5) Hot tub not level after new placement 6) helical pier/posts not plumb by level. The bubble is outside of-but barely touching the parameter lines on the level. 7) Helical post shoes attached to frame by 1 single lag bolt, rather than 2 lag bolts, as they are designed for. 8) general carelessness, dirty, with paint splashes, portions of screen not affixed. The only excuse provided is that “the quality is at the level expected for an outside job”. However-it is not outside-it has a floor, ceiling, walls…and therefore inside. I could go on and on. I advise extreme caution when considering any contractor. You must be an expert in contracts-anything not explicit in the contract may not be done. The above are all verifiable facts. I have left out any personal feelings. Use your own judgement based on these facts.
UPDATED: this contractor has responded here that "we have reached an agreement and that all issues are resolved". Not true. No issues have been resolved. None. Not even the framing issue identified by my town inspector, which means that I cannot get a CO now. The agreement was only a release stating only that we won't sue each other and that is only because it is not worth my time or money for an attorney. In fact-I have an active dept of consumer protection complaint and am seeking to have their license revoked. This won't be easy, but I really do not want this company to do to others what they did to me.
12 Comments