We hired Dan Tewksbury over 13 months ago to redo our kitchen and floors. We fired him after months and months of trying to get him to complete our kitchen. We had to have him replace several tiles and the tile floors had to be re-grouted twice and there are still bad spots. He persuaded us into having him build custom cabinets. He initially started the job in the beginning of August of2020, on December 23rd he installed cabinet boxes so he could put in a stove and fridge so we could have a Christmas dinner. The cabinet doors have been installed a few here and there. Poor craftsmanship on what he did install. Doors are not square, not level, and warped. The paint is inconsistent. He used a roller to touch up paint on finished cabinet doors. He installed handles 3/4 in too high. He installed the wrong handles after I had just gone over with him what handles go where. 1/3 of the doors are still not done or installed. I had to install the rest of the door and drawer pulls. He installed door fronts on cabinets, that there is no drawer behind. He just screwed the fronts to the cabinet box. We finally fired him in September of 2021 and our kitchen is about 2/3 completed. Thank This is about a quarter of my complaints about the work of Dan Tewksbury.