Shop Products
Houzz Logo Print
nmee

kitchen remodel: cabinets hung before drywall repair

Nancy Mee
11 years ago

New kitchen cabinets were hung the day they were delivered. I was not at home. Two questions:

  1. They were built locally. How important is acclimating for cabinets?

  2. They were hung before the drywal was repaired. The whole backsplash area (7'x 18") between counter and upper cabinets is open to studs which extends behind the cabinets. They should be taken down and drywall repaired, taped and textured, correct?

My general contractor's crew did this, and upon his arrival, he said nothing.

Comments (7)